Development Plans

The following development works are planned for the Jordan River Terminal: 

  • Adding 2 motor car inspection pits, in addition to the 2 existing pits.
  • Expanding the work area at the Freight Terminal.
  • Paving a western access road to the Freight Terminal.
  • Altering the junction at the entrance to the Passenger Terminal.
  • Moving the main entrance gate to the west, next to the parking lot.
  • Paving an access road from the western freight road to the Passenger Terminal.
  • Paving a traffic circle for private vehicles that allows access to the parking lot or back to the road to Beit She’an.
  • Building a waiting structure for Jordanian drivers at the entrance to the Freight Terminal.
  • Designing and constructing shaded entrance gates, including the Border Control area at the Drive-in.
  • Constructing a pump station and sewer line to the regional sewage system.
  • Placing biometric border control devices in the Arrivals and Departures Halls.
  • Introducing a VIP service for the passengers' convenience.
  • Planning and moving offices into a permanent structure.
  • Moving the dining hall and IDF unit into a permanent structure.
 
 
 
 
 
 
 
 