Type of Service |
Unit |
Rate in NIS, linked to the Index of July 1, 2004 |
Comments |
|
1. |
Handling of paperwork |
Truck |
28.04 |
For trucks to which no other service was provided |
|
2. |
Porter services (including security check) |
|
|
|
|
|
Bulk aggregate and sand for building and development |
Ton |
1.20 |
|
|
|
Bulk materials that are not aggregate for building and development |
Ton |
6.57 |
|
|
|
Palleted – import pallets |
Unit |
26.06 |
Size of pallet: Up to 120 X 120 X 180 cm.
Weight of pallet: Up to 2.5 tons |
|
|
Palleted – export pallets |
Unit |
19.26 |
Size of pallet: Up to 120 X 120 X 180 cm.
Weight of pallet: Up to 2.5 tons |
|
|
Big Bag, up to 1 ton. |
Unit |
13.60 |
Over 1 ton, the tariff is as per the pallet rate. |
|
3. |
Lifting a 20 ft. Container (Back to Back) |
Container |
169.46 |
|
|
|
Lifting a 40 ft. Container (Back to Back) |
Container |
251.75 |
|
|
|
Transfer of a 20 ft. Container (Back to Back) |
Container |
84.15 |
|
|
|
Transfer of a 40 ft. Container (Back to Back) |
Container |
125.88 |
|
|
4. |
Connection of a cold storage container to electricity (20 and 40 ft.) |
Container |
45.30 |
|
|
5. |
24 hour storage (first week) |
|
|
For storage up to 72 hours |
|
|
Pallet |
Unit |
5.30 |
|
|
|
20 ft. Container |
Unit |
39.37 |
|
|
|
40 ft. Container |
Unit |
59.65 |
|
|
|
20 ft. Cold Storage Container |
Unit |
49.51 |
|
|
|
40 ft. Cold Storage Container |
Unit |
99.02 |
|
|
|
Consignment storage |
Ton |
12.06 |
|
|
|
Bulk aggregate |
Ton |
0.35 |
|
|
|
Connection of a container to electricity (20 and 40 ft.) |
Unit |
45.30 |
|
|
* |
As of the second week, the rate is doubled |
|
|
|
|
6. |
Unspecified work (one hour or part thereof) |
|
|
|
|
|
Hourly wage laborer / operator |
Hourly wage |
|
|
|
|
Forklift up to 2.5 tons |
Hourly wage |
|
|
|
|
Forklift over 2.5 tons. |
Hourly wage |
|
|
|
|
Other machinery – actual cost + 40% |
|
|
The imported is permitted to use his own equipment, coordinated with the concession holder, and with the authorization of Manager of the Terminal. In this case, payment is in accordance with clause 7. |
|
7. |
Work Space at the Terminal |
Truck |
55.44 |
In accordance with the comments for the Other Machinery clause only. |
|
8. |
Hazmat 25% addition to the porter and storage tariff. |
|
|
|
|
9. |
Compensation with respect to a no show of an order, 25% of the expected income. |
|
|
|
|
10. |
Addition with respect to work after the hours of activity at the Terminal – 30% above the tariff. |
|
|
|
|
11 |
Weighing of a truck |
|
27.56 |
|